skip to contentskip to navigation

Project Profiles

Skip Navigation Links

01 Panel Beaters.

01 Panel Beaters.

The Blue-Tip Screwbolt’s resistance to vibration and superior holding power ensures that the anchor remains secure when subjected to the considerable forces imparted during normal operation of jig equipment.

PDF Document Download further information [7897]


02 Heller

02 Heller

Incorporating unique dual-action teeth and DIY simplicity the Heller Ratio Drilling System significantly reduces the time and cost involved in large diameter concrete coring. The Heller Ratio Drilling System may be used with any standard drilling machine and are easily disassembled for compact stora

PDF Document Download further information []


03 Acrylic100

03 Acrylic100

The installation of a steel plate protecting wall, to upgrade the Nunawading Transfer Station’s waste pit, is an excellent example of the ACRYLIC-100®’s performance, economy and convenience. Its superior strength allows shallower embedment for the same load, saving material.

PDF Document Download further information []


04 Tunnel

04 Tunnel

In December 1997, Powers Fasteners were awarded the contract to supply over 7000 High Performance stainless steel Socket Anchors to Transfield Obayashi Joint Venture. The tender package also called for the complete fastening system to be installed quickly and safely. Seven, Australian made, purpose

PDF Document Download further information []


05 Airport Rail Link

05 Airport Rail Link

POWER-FAST™ Epoxy, and POWER-BOLT® Safety anchors were specified by the RSA for the entire electrical fit-out of the New Southern Rail Link requiring more than 22,000 high performance adhesive and mechanical anchoring systems.

PDF Document Download further information []


06 M4 Sound Barrier

06 M4 Sound Barrier

Decorative sound barriers installed along an elevation section of the M4 Motorway in Sydney were recently installed using the new patented Chem-Bolt® with Power-Fast™ adhesive injection gel. The Chem-Bolt® / Power-Fast™ anchoring system was chosen by RTA bridge designers for it’s ease of use, superi

PDF Document Download further information []


07 Fed Square 1d

07 Fed Square 1d

Powers Fasteners has established an enviable reputation on this major construction site in Melbourne, with its high performance Powerfast Epoxy Injection Gel adhesive system, by providing a solution for a difficult problem in the installation of the façade support structure.

PDF Document Download further information []


08 Fed Square SFS

08 Fed Square SFS

The SFS SX6/D12/A10/5.5/28 self-drilling stainless steel screw has the ability to screw through 6mm steel without a pilot hole, decreasing the labour content considerably. The low head profile exactly matched what the designers were looking for in aesthetic appearance, and being 316 stainless steel,

PDF Document Download further information []


09 Bathurst High Rise

09 Bathurst High Rise

The Forming SPIKE® was used for this application due to its speed of installation, its ease of removal, reusability and that there is no metal left in the hole to corrode later. Building Durability Group enquired about options for a safe, quick and efficient temporary method of attaching the form to

PDF Document Download further information []


10 North Side

10 North Side

The Northside Storage Tunnel Project consisted of the construction of two tunnels at a depth of 40m - 100m below sea level. The major tunnel runs 16km from Lane Cove to Manly with the second tunnel branching off the main tunnel at Tunks Park to go 3.7km to Scotts Creek.

PDF Document Download further information []


11 SFS Irius

11 SFS Irius

The SFS intec SX14 L12 irius drive self drilling screw was chosen for its highly aesthetic finished head style and the significant labour cost saving achieved as the stainless screws could be installed without pre-drilling the steel.

PDF Document Download further information []


12 Power-Fast

12 Power-Fast

This is an excellent example of the versatility offered by using the Power-Fast PLUS® epoxy injection gel. Easily installed by using a Powers pneumatic application gun.

PDF Document Download further information []


13 Warragamba Dam

13 Warragamba Dam

Because Warragamba Dam and its catchment provides drinking water to over 80% of Sydneysiders, heavy emphasis was placed on use of environmentally friendly products and safe work practices. Products such as Acrylic AC100® and Power-Fast® adhesives were used.

PDF Document Download further information []


14 M5

14 M5

The M5 East required the construction of 6 road interchanges, 5 road bridges, 4 pedestrian underpasses, two 4km driven / cut traffic tunnels and a cut and cover crossing at the Cooks River. Powers Fasteners was heavily involved at all facets of this project providing information and advice at design

PDF Document Download further information []


15 Vertigo

15 Vertigo

Suspended services from thin structural steel roof purlins are often a concern, particularly when heavier load suspensions are required such as cable tray, pipe work or ductwork. Powers Fasteners provided yet another fast, cost effective problem solving fixing system that could not be matched from a

PDF Document Download further information []


16 Tapper

16 Tapper

Powers Fasteners’ experience in providing fastening solutions in tunnel projects has once again proved to be the winner when put up against the competitors’ offering.

PDF Document Download further information []


17 NZ

17 NZ

Powers Fasteners innovative Chem-Bolt system was the perfect high performance anchoring solution for the temporary “Tilt Panel” foot anchoring at the new Silver-Field West water drainage project in New Zealand’s North Island.

PDF Document Download further information []


18 Pilbara Housing

18 Pilbara Housing

A large Australian Mining Co. commissioned the construction of 25 steel frame homes in Port Hedland via Pilbara Constructions. The construction of these homes required high strength tie down fixings able to withstand cyclonic winds and the harsh elements that exists in Port Hedland.

PDF Document Download further information []


19 Powerstick

19 Powerstick

Powers latest adhesive development PowerStick™ has delivered a quality solution to a difficult application. Owner Builder Mr Gary Motton wanted to achieve a "fastenerless" finish to his miniorb cladding on the lifestyle cabins....

PDF Document Download further information []


20 Westlink M7_1

20 Westlink M7_1

Westlink M7 – Orbital Ring Road, 40km dual carriageway, 17 interchanges, 38 overpasses and a 40km shared cycle/pedestrian pathway

PDF Document Download further information []


21 Westlink M7_2

21 Westlink M7_2

Westlink M7 – Orbital Ring Road, 40km dual carriageway, 17 interchanges, 38 overpasses and a 40km shared cycle/pedestrian pathway

PDF Document Download further information []


22 Westlink M7_3

22 Westlink M7_3

Westlink M7 – Orbital Ring Road, 40km dual carriageway, 17 interchanges, 38 overpasses and a 40km shared cycle/pedestrian pathway...

PDF Document Download further information []


23/24 Risdon Prison

23/24 Risdon Prison

Fairbrother Pty Ltd, in partnership with John Holland Pty Ltd, was awarded the $58.0M construction of the Tasmanian Prisons Redevelopment Program (Stage C) at Risdonvale in November 2003...

PDF Document Download further information []


24 Dubai

24 Dubai

When planning began in 1997 for the future development of the Airport, projected passenger numbers of 9 million were forecast to be reached over the next decade...

PDF Document Download further information [786963]


25 Siam Paragon

25 Siam Paragon

A 2 year construction project costing US$375 million, totaling 500,000 sq meters of prime land, is the home to over 250 famed international and local brands under one roof...

PDF Document Download further information []


26 Perth Mandurah

26 Perth Mandurah

Powers Fasteners have been involved in the cutting edge of Rail technology fastening in Western Australia. By far the largest infrastucture project to be built in the Perth vicinity for many years has been the Perth-Mandurah railway line.

PDF Document Download further information []


27 New Zealand C4

27 New Zealand C4

The latest technology in High Powered Concrete Gas

PDF Document Download further information [175191]


28 Trigger Foam

28 Trigger Foam

Powers Trigger Foam at the new DFO Project

PDF Document Download further information [172536]


29 Gatton Prison

29 Gatton Prison

From start to finish the Gatton prison saw an array of Powers products used across many trades and applications.

PDF Document Download further information []


No Project Profile Documents Available

No Project Profile Documents Available



PDF Document Download further information []