Home / Drilling / Drilling Product
FITS ALL “Y” Cutter Range
FITS ALL “Y” Cutter Range
|
click a heading to expand it
Related Technical Information:
|
|
Technical Literature Documents
|
| |
|
|
Material Safety Data Sheets (MSDS)
|
| |
|
|
Project Profile Documents
|
| |
|
07 Fed Square 1d ()
Powers Fasteners has established an enviable reputation on this major construction site in Melbourne, with its high performance Powerfast Epoxy Injection Gel adhesive system, by providing a solution for a difficult problem in the installation of the façade support structure. |
|
09 Bathurst High Rise ()
The Forming SPIKE® was used for this application due to its speed of installation, its ease of removal, reusability and that there is no metal left in the hole to corrode later. Building Durability Group enquired about options for a safe, quick and efficient temporary method of attaching the form to |
|
10 North Side ()
The Northside Storage Tunnel Project consisted of the construction of two tunnels at a depth of 40m - 100m below sea level. The major tunnel runs 16km from Lane Cove to Manly with the second tunnel branching off the main tunnel at Tunks Park to go 3.7km to Scotts Creek. |
|
13 Warragamba Dam ()
Because Warragamba Dam and its catchment provides drinking water to over 80% of Sydneysiders, heavy emphasis was placed on use of environmentally friendly products and safe work practices. Products such as Acrylic AC100® and Power-Fast® adhesives were used. |
|
|
|
mouse-over image for description